the project involved making alterations to the internal layout of the space, adjusting the VRF system to ensure consistent temperature control, enhancing the entrance and waiting area for visitors, expanding flexible meeting and collaboration spaces, and providing suitable workstations for flexible hot desking.
completing the scheme within a narrow time window was crucial to minimise disruption to the ongoing business operations. pre-existing issues with the VRF heating/cooling system needed resolution to ensure the scheme operated as intended. additionally, congestion in the ceiling void posed challenges for fire stopping.
our experienced team advised on the project so that works were completed on schedule, allowing the occupants to move back into the space promptly. a high-quality finish was achieved – to the satisfaction of the tenants, as the completed space has been found to better meet their needs and provide improved functionality and usability.
what we've done
quick links
UDC consultancy
Functional architecture project management
from Urban Design & Consult.
Trading Office : The Old Steelworks, 5 West Ashton Street, Salford, M50 2XS
Registered Office: Mynshull House, 78 Churchgate, Stockport, Cheshire, England, SK1 1YJ.
Company No. 07821555 VAT No. GB127 3576 07
© Urban Design & Construct.
All Rights Reserved.
Urban Design & Consult Ltd.
All Rights Reserved
© Urban Design & Construct | All Rights Reserved